Files
nexus/knowledgebase/csd-wiki/ICSD/OO-APM-Monitoring-Business-Flow_686073823.md

6.7 KiB

OO-APM-Monitoring-Business-Flow_686073823

Introduction

This document describes the use cases used for OO RUM (Real User Monitoring) testing.

OO APM Monitoring Business Flow

SMAX LOGIN

This will load Agent Interface. (optional): Opentext menu(3 lines) and click -Agent Interface

1.Check availability of Automation Operations

**1.a.**Navigate to Run>Automation Operations: https://- smax.saas.microfocus.com/oo/?tenantId=#/runtimeWorkspace/runs

It should load by default: Example: https://oo.eu8-smax.saas.microfocus.com/oo/?tenantId=384525684#/runtimeWorkspace/runs

**1.b.**See that Run Management > Run Explorer is available by default.

**1.c.**Select Content Management. See that Flow Library is available by default.

2.Check availability of Orchestration Settings

**2.a.**Navigate to Administration>Orchestration Settings: https://- smax.saas.microfocus.com/oo/?tenantId=#/systemWorkspace/t opology

**2.b.**See that Topology is available by default.

Example:https://oo.eu8-smax.saas.microfocus.com/oo/?tenantId=384525684#/systemWorkspace/topology

2.c.See Workers tab is available and that at least one worker is Enabled and Available

3.Run OO out-of-the-box AFL Flow

**3.a.**Navigate to Run>Automation Operations as in 1.a. above: https://- smax.saas.microfocus.com/oo/?tenantId=#/runtimeWorkspace/runs

3.b.Go to Run Management > Flow Launcher

3.c.Search for: How do I

3.d.Pick How do I create a parallel flow

**3.e.**Select Open Run After Launch

**3.f.**Press Run

**3.g.**See that a pop-up appears with Status message

**3.h.**Press Resume and Wait for it to self refresh!!!

**3.i.**See that the flow completes successfully in the pop-up that appears. Then click to close on top right X.

4.Run OO out-of-the-box CloudSlang Flow (SKIP this STEP, till OO is on 24.4.1 for all farms)

**4.a.**Navigate to Run>Automation Operations as in 1.a.: https://- smax.saas.microfocus.com/oo/?tenantId=#/runtimeWorkspace/runs

**4.b.**Go to Content Management > Flow Library

**4.c.**Search for: verify

**4.d.**Pick: verify_url_is_accessible

**4.e.**Fill in URL to the Automation Operations actual url (example: https://oo.-smax.saas.microfocus.com/)

https://oo.eu8-smax.saas.microfocus.com /

**4.f.**Press Run

**4.g.**See that the flow completes successfully in the pop-up that appears and Wait for it to self refresh with final status!!!

4.h. See that the flow completes successfully in the pop-up that appears. Then click to close on top right X.

5.Schedule an out-of-the-box Flow

  • 5.a.Navigate to Run>Automation Operations as in 1.a.: https://- smax.saas.microfocus.com/oo/?tenantId=#/runtimeWorkspace/runs

**5.b.**Go to Run Management > Scheduler

**5.c.**Press the + (create) button.

**5.d.**Select flow Path

**5.e.**Search for: generate random

**5.f.**Pick up: generate random number from io folder. and click SELECT.

**5.g.**Press Next

**5.h.**Pick a recurrence: yearly. Make sure it is several months from the date of the schedule.

**5.i.**Press Next (it will not move further unless the start time is in the future)

**5.j.**Press Finish

**5.k.**See that the schedule has been created and available in the list.

**5.l.**Select the schedule. Press the edit button. Change the schedule name. Press Next, Next, Finish.

**5.m.**See that the schedule has been edited and the new name is available in the list.

**5.n.**Select the schedule. Press the Delete button Icon at top left and confirm the removal.

**5.o.**Confirm table has no records.

Attachments:

image-2025-1-21_13-49-42.png (image/png)
image-2025-1-21_13-49-58.png (image/png)
image-2025-1-21_13-50-16.png (image/png)
image-2025-1-21_13-51-0.png (image/png)
image-2025-1-21_13-51-29.png (image/png)
image-2025-1-21_13-51-51.png (image/png)
image-2025-1-21_13-52-11.png (image/png)
image-2025-1-21_13-53-33.png (image/png)
image-2025-1-21_13-53-49.png (image/png)
image-2025-1-21_13-56-40.png (image/png)
image-2025-1-21_13-57-2.png (image/png)
image-2025-1-21_13-57-20.png (image/png)
image-2025-1-21_13-57-37.png (image/png)
image-2025-1-21_13-58-19.png (image/png)
image-2025-1-21_13-59-11.png (image/png)
image-2025-1-21_13-59-35.png (image/png)
image-2025-1-21_14-0-13.png (image/png)
image-2025-1-21_14-2-1.png (image/png)
image-2025-1-21_14-2-31.png (image/png)
image-2025-1-21_14-2-50.png (image/png)