Files
nexus/wiki/concepts/Proof-of-Concept.md
2026-04-29 00:02:51 +08:00

60 lines
2.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
title: "Proof of Concept"
type: concept
tags: [CTP, Cloud, AWS, POC]
sources: [ctp-topic-20-program-demand-process-flow-and-poc-onboarding]
last_updated: 2026-04-14
---
## Definition
概念验证Proof of Concept, POC是在正式云迁移前用于证明架构可行性、测试复杂网络需求及验证迁移方法的实验性阶段。是降低云迁移风险的核心手段。
## POC Objectives
- **架构可行性验证**:确认目标云架构能够满足业务需求
- **技术可行性测试**:验证复杂网络配置、依赖关系和集成点
- **团队能力建设**:让团队熟悉基于 Gruntwork 的新一代 Landing Zone 环境
- **风险识别**:在正式迁移前发现并解决潜在问题
- **迁移方法验证**:验证数据迁移和应用迁移的具体方法
## POC vs 传统"经典落地分区"
| 维度 | 传统方式 | 新一代 Landing Zone + POC |
|------|----------|---------------------------|
| 构建方式 | 手动构建 | IaCTerraform/Terragrunt自动化 |
| 可重复性 | 低 | 高(通过代码复用) |
| 环境一致性 | 难以保证 | 严格一致 |
| 文档化 | 分散 | 集中于 IaC 代码 |
| 审计追踪 | 困难 | Git 版本控制 |
## POC Deliverables
POC 阶段必须产出的关键交付物:
- **解决方案设计文档**:经过 Design Authority 审批的架构设计
- **IaC 脚本**:可用于正式部署的 Terraform/Terragrunt 配置
- **迁移时间表**:明确的里程碑和交付日期
- **成功标准验证报告**:证明产品已具备进入生产环境迁移的条件
## Success Criteria
POC 成功标准必须在启动前明确定义,包括:
- 技术可行性指标(架构满足需求)
- 性能指标(满足 NFR 定义的非功能性需求)
- 安全合规指标(通过安全评审)
- 团队能力指标(团队能够独立运维新环境)
## Related Concepts
- [[Program-Demand-Process]]POC 是需求流程的关键验证环节
- [[Gate-Process]]POC 阶段受 Gate 1 Design Authority 审批约束
- [[Solution-Design]]POC 的核心产出物,需审批后方可进入迁移
- [[Landing-Zone-Architecture]]POC 部署的目标环境基础
- [[Infrastructure-as-Code]]:新一代 Landing Zone 的核心技术手段
## References
- [[ctp-topic-20-program-demand-process-flow-and-poc-onboarding]]