Files
nexus/wiki/concepts/weighted-shortest-job-first.md
2026-04-29 00:02:51 +08:00

53 lines
1.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
title: "Weighted Shortest Job First (WSJF)"
type: concept
tags:
- SAFe
- Prioritization
- WSJF
- CTP
- Value-Delivery
sources:
- ctp-topic-65-tracing-the-value-delivered-in-cloud-transformation
last_updated: 2026-04-28
---
## Definition
WSJF 是 Scaled Agile Framework (SAFe) 中用于**排列工作优先级**的量化方法。通过将"延迟成本"Cost of Delay除以"工作规模"Job Size得到每单位工时的价值回报优先做 WSJF 值最高的工作。
## Formula
```
WSJF = Cost of Delay (CoD) / Job Size
```
**Cost of Delay (CoD)** 由三部分构成:
- **Business Value**(业务价值):对客户的直接经济影响
- **Time Criticality**(时间紧迫性):推迟交付的价值损失
- **Risk Reduction / Opportunity Enablement**(风险降低 / 机会实现)
## Interpretation
| WSJF 值 | 优先级 | 含义 |
|---------|--------|------|
| 高 | 🔴 最高 | 价值高 + 工作量小,优先做 |
| 中 | 🟡 中等 | 价值与工作量平衡 |
| 低 | 🟢 低 | 价值低 + 工作量大,延后做 |
**核心理念**`What we want to do is deliver the maximum value early back into the business for the least amount of effort.` — 以最小投入尽早交付最大价值。
## Related Concepts
- [[Cost of Delay (CoD)]]WSJF 公式的分子
- [[Value Stream]]WSJF 应用于价值流内的项目排序
- [[Process]]WSJF 优化的是过程输出的价值交付效率
## Related Sources
- [[CTP Topic 65 Tracing the Value Delivered in Cloud Transformation]]
## Aliases
- WSJF
- Weighted Shortest Job First